Indian Railways. Proper up keeping and maintenance of WSP system is necessary to ensure reliability and availability of coaches. This Handbook on WSP system has been prepared by CAMTECH with the objective that those involved in maintenance of LHB other FIAT bogie fitted coaches, must be aware of WSP system and. Codes And Manuals. Code Revision Cell. Indian Railways Establishment Manual (Vol-1) Railway Board - e-mail: socr@www.doorway.ru, saoar@www.doorway.ru Indian Railways Establishment Manual (Vol-1) Correction Slip No. ACS ACS This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways.
General Subsidiary Rule Book, Chapter II of Operating Manual dealing with “Working of Stations” and Block working Manual as amended from time to time. I. Responsibility of Station Master (supervisory)/Station Manager i. Station Master is responsible for the efficient discharge of duties by different members of staff at his Station. Indian Railways. (d) Indian Railways Centre for Advanced Maintenance Technology IRCON (a) Indian Railway Construction Company Ltd. (b) Indian Railway Committee on Negotiation. (c) Indian Railway Container Company Ltd. (d) Indian Railway Communication On line service IRFC (a) Indian Railway Finance Committee (b) Indian Railway Finance Council.
Locomotives - Engine or motive power source to haul a train. Railway Board have issued instructions to do away with Safe-to-run examination;. Triple Pole, Outdoor Sf6 Circuit Breakers for Indian Railway (Item) Manganese Wedge (Modified-I) (Item), Manual Matal Arc Welding Electrode. Gen. service sub stations from camtech [] · Maintenance handbook on Roof Duties of AC Coach Escorting Staff · Evolution of Train lighting.
0コメント